Skip to content

How it works

How we engineer it.

From your floor plan to labels on the beam, in four steps. No location list? That's fine: we count your locations and build one.

Photo · Labels installed in sequence

The process

Four steps, floor plan to beam.

  1. 01

    Requirements

    Send a floor plan, photos, or your location list if you have one.

  2. 02

    Design + sequence

    We build your location system and send a proof for approval.

  3. 03

    Print + laminate

    We print, laminate and quality check your labels.

  4. 04

    Install + verify

    Our crew installs every label on your racks and scans each one to confirm it’s live in your WMS.

What goes in and what comes out

What we need from you

  1. 01Floor plan or photos
  2. 02Location list, or we count
  3. 03WMS location format

What ships with every order

  1. 01Labels, printed in-house and laminated
  2. 02Facility map
  3. 03Sequential installation guide
  4. 04Quality checklist
Photo · The install kit, laid out
See the label formats

Contact

Tell us about your facility.

Send us your floor plan and we'll get started.

Request a quote